Inspection & Testing
Don’t wait for a breakdown. Our certified technicians identify problems early — keeping your systems compliant, efficient, and running at full capacity.
Why facility managers trust us
30+ years
Cooling tower experience
2,000+
Inspections completed across the U.S.
100%
Uncompromised safety standards
72 hrs
Detailed inspection report turnaround
How our inspection process works
A structured, repeatable process, so nothing gets missed and you always know what’s next.
-
Schedule & pre-inspection review
We gather your system specs, maintenance history, and any known concerns before arriving on-site. This lets us tailor the inspection to your specific tower type and operating conditions.
-
On-site visual & mechanical inspection
Our certified technicians conduct a comprehensive walkthrough — inspecting structural components, fill media, drift eliminators, distribution systems, mechanical components, and basins for wear, corrosion, or damage.
-
Performance & efficiency evaluation
Using thermal performance data and visual inspection, we assess whether your tower is operating at rated capacity and identify efficiency losses costing you energy.
-
Detailed report & recommendations
Within 72 hours, you receive a full inspection report with photo documentation, prioritized findings, and actionable repair or maintenance recommendations.
Included in every inspection
Every inspection follows the same scope, so you get a complete picture of tower condition.
Structural & mechanical
Condition of the tower structure, both external and internal.
-
Distribution system
-
Fill media inspection
-
Drift eliminators
-
Fan assembly, driveshaft, gearbox, and motor
-
Louvers & casing panels
Water quality
Effect of water characteristics on cooling tower components
-
Biological growth
-
Fouling potential
-
Scaling & corrosion
-
Water treatment program recommendations
Full photo-documented inspection report
Every inspection includes a written report with labeled photos delivered within 72 hours.
-
Tower component information
-
Labeled photos
-
Test data
-
Prioritized findings list
-
Repair or maintenance recommendations
Inspection and Repair Services
Thorough evaluations to keep your systems safe and compliant.
-
Thermal Upgrade Recommendations
-
Preventive Maintenance Inspections
-
Fill Media Replacement
-
Hot Water Basin Cleaning
-
Drift Eliminator Replacement
-
Fan Blade Pitching/Tip Clearance Checks
-
Structural Repairs
-
Performance Testing
-
Wood to Fiberglass Conversions
-
Emergency Repairs & Response
-
Water Flow Rate Optimization
-
Noise & Vibration Analysis
-
Heat Transfer Analysis
-
Mechanical Access Walkways
-
Nozzle & Distribution System Service
-
Cooling Tower Retrofits & Upgrades
-
Energy Efficiency Audits
Signs your tower needs an inspection
Unexplained increases in energy costs
A tower operating below design performance can force fans, pumps, and associated equipment to work harder, increasing energy consumption and operating costs.
Visible scale or biological growth
Algae, slime, or heavy scaling in the fill, drift eliminators, or distribution system are signs of water quality issues or poor fill selection.
Unusual noise or vibration from the fan
Rattling, grinding, or excessive vibration can indicate worn bearings, damaged fan blades, driveshaft misalignment, gearbox problems, or other mechanical issues.
Your system hasn’t been inspected in over 12 months
Cooling towers need annual inspections at a minimum to confirm optimal thermal performance and safe operations
Cold water temperatures are higher than normal
This can indicate fouled or deteriorated fill, reduced airflow, poor water distribution, damaged fans, or changing process conditions.
After extended shutdown or seasonal startup
Extended downtime can leave fill, basins, distribution systems, and mechanical components vulnerable to fouling, corrosion, biological growth, and startup-related failures. A thorough inspection before returning to service can help identify problems early.
Planning a shutdown or turnaround?
Get a service engineer on a call to schedule an inspection or repair
Leave your cooling tower to the experts.
Ready to schedule your inspection?
Most inspections can be scheduled within 5–7 business days.