Wood to Fiberglass Conversions
Extend the life of your cooling tower with wood-to-fiberglass conversion repairs. Replace deteriorating wood with durable fiberglass components engineered for long-term performance.
Why facility managers trust us
30+ years
Cooling tower experience
2,500+
Towers serviced
100%
Uncompromised safety standards
72 hrs
Detailed inspection report turnaround
How our repair process works
A structured, repeatable process, so nothing gets missed and you always know what's next
-
Identification of scope/ on-site inspection
We assess the tower, identify the source and extent of damage or deterioration, and develop a detailed repair scope utilizing the original tower design with new FRP members
-
Mobilization
Once the scope is established, CTD coordinates the crew, equipment, materials, and critical parts needed for the project. We plan logistics and site requirements to get the repair team on-site and ready to work efficiently.
-
Repairs/Upgrades
Our experienced field crews perform repairs, replacements, and upgrades—from individual structural members to complete cell conversions using durable FRP components. We restore structural integrity and reliable tower performance while minimizing downtime.
-
Demobilization
After repairs are complete, we inspect the completed work, remove equipment and materials, and leave the site clean and ready for operation. Final documentation and recommendations are provided as needed.
Critical parts available
Fan stacks built and stocked in Oklahoma
-
Fan assemblies
-
Gearboxes
-
Driveshafts
-
FRP/lumber structure
-
Corrugated casing
Rapid mobilization
Field crews dispatched quickly to assess damage and begin repairs nationwide
-
BOP compliant
-
TWIC credentialed
-
DISA qualified
-
OSHA 10/30 certified
-
Confined space trained
Ready for any repair
Includes all major systems and components for counterflow towers
-
Mechanicals
-
Fan deck & fan stacks
-
Fill & drift eliminators
-
Distribution system
-
Casing & structure
Repair Services
To reduce downtime and get your cooling tower operating at full capacity
-
Inspections
-
Preventative Maintenance
-
Fan stack replacement
-
Fan assembly replacement
-
Gearbox replacement/rebuilds
-
Driveshaft replacement/alignment
-
Motor replacement
-
Casing repair
-
Structural member repairs- Douglas fir/FRP
-
Access platforms, walkways, ladders, and handrails
-
Stair tower repairs/upgrades
-
Louver repairs
-
Noise & vibration analysis
-
Fan deck repairs
-
Partition/wind/wing/fire wall repairs
-
Fill replacement
-
Drift eliminator replacement
-
Distribution system repairs/flushing
-
Wood to FRP conversions
-
Tip clearance/re-pitch fan blades
Signs your tower needs an inspection
Deteriorated wood members
Visible rot or decay, structural failures, and deteriorated plywood decking can compromise a cooling tower's integrity and service life. When deterioration becomes widespread, an FRP conversion can provide a durable, long-term solution.
Visible scale or biological growth
Algae, slime, or heavy scaling in the fill, drift eliminators, or distribution system are signs of water quality issues or poor fill selection.
Unusual noise or vibration from the fan
Rattling, grinding, or excessive vibration can indicate worn bearings, damaged fan blades, driveshaft misalignment, gearbox problems, or other mechanical issues.
Your system hasn’t been inspected in over 12 months
Cooling towers need annual inspections at a minimum to confirm optimal thermal performance and safe operations
Cold water temperatures are higher than normal
This can indicate fouled or deteriorated fill, reduced airflow, poor water distribution, damaged fans, or changing process conditions.
After extended shutdown or seasonal startup
Extended downtime can leave fill, basins, distribution systems, and mechanical components vulnerable to fouling, corrosion, biological growth, and startup-related failures. A thorough inspection before returning to service can help identify problems early.
Planning a shutdown or turnaround?
Get a service engineer on a call to schedule an inspection or repair
Leave your cooling tower to the experts.
Ready to schedule your FRP conversion?
Most inspections can be scheduled within 5–7 business days.