FM-Approved Cooling Towers
Engineered to withstand fire, natural hazards, and structural risks. Built to minimize damage, downtime, and the cost and complexity of additional fire protection measures.
↑ vs ↓
Air vs water
Glacier™
Fill Media
NFPA 214
Compliant
Full-scale
Fire tested
How an FM-approved tower works
4930 approval certifies compliance with fire performance, natural hazards testing, seismic analysis, and quality audits of combustible components. These tests include: tropical cyclone missile test, full-scale fire testing, and cyclic wind pressure test
Choose FM-Approved When
-
Facilities insured by FM Global or working with insurers that require FM-Approved equipment
-
Operational reliability is critical
-
Facilities located in high-risk areas for natural hazards
-
Avoid the cost and complexity of a dedicated fire protection system
Trade-Offs to Weigh
-
Generally higher upfront cost
-
Limited component flexibility to maintain FM approval
-
Potential for longer lead times