Data Centers & Semiconductor

Rack densities keep climbing, and the plant has to keep up. CTD sizes, builds, and services cooling towers for data center loads: redundant configurations, water-use targets, and tight site footprints, backed by 24/7 parts and field service.

Data Centers

10+

Data center sites

N+1/2N

Redundancy

<4 hrs

Emergency response

24/7

Monitoring & parts

The Challenges

  • Rack densities outpacing legacy plant capacity

  • Water-use limits and local permits

  • Zero tolerance for unplanned downtime

  • Tight roof/yard footprints

How We Approach It

  • Selections sized to your targets

  • Hybrid wet/dry where water is constrained

  • 24/7 emergency crews and stocked parts

  • Counterflow & CFM Series configuration

Crew working on a cooling tower fan deck

Need Maintenance at Your Plant?

Parts and field service for data center cooling towers, OEM or not.

Frequently Asked Questions

How do you size a cooling tower for a data center?

We size to your thermal duty and design wet-bulb, then check the selection against your PUE and WUE targets rather than a catalog default.

Can you build N+1 or 2N redundancy into the design?

Yes. Cell count and configuration are set so the plant holds design capacity with a cell out of service for maintenance or failure.

What are the options if my site has water restrictions?

Where consumption is capped by permit or supply, we look at hybrid wet/dry arrangements and plume-abated designs that cut water use while holding thermal performance.

How fast can you respond if a tower goes down?

Critical cooling tower parts are available 24/7, with experienced emergency response teams ready to mobilize within days to perform repairs and restore reliable operation.