Skip to main content

Structural Materials

Shop cooling tower structural components, including fiberglass and lumber in a variety of profiles and dimensions

73-96 / 218 results, sorted by Relevance

  • Structural Materials
Sale

2" X 2" 20’ Douglas Fir

CTD-2.2.20-DF

$30.81

100000001953
Sale

2" X 2" 18’ Douglas Fir

CTD-2.2.18-DF

$27.72

100000001954
Sale

2" X 2" 16’ Douglas Fir

CTD-2.2.16-DF

$24.64

100000001955
Sale

2" X 2" 14’ Douglas Fir

CTD-2.2.14-DF

$21.57

100000001956
Sale

2" X 2" 12’ Douglas Fir

CTD-2.2.12-DF

$18.49

100000001957
Sale

2" X 2" 10’ Douglas Fir

CTD-2.2.10-DF

$15.40

100000001958
Sale

2" X 2" X 10' Redwood

CTD-2.2.10-RW

$30.38

100000001996
Sale

2" X 2" X 12' Redwood

CTD-2.2.12-RW

$36.46

100000001997
Sale

2" X 2" X 14' Redwood

CTD-2.2.14-RW

$42.53

100000001998
Sale

2" X 2" X 16' Redwood

CTD-2.2.16-RW

$48.61

100000001999
Sale

2" X 2" X 18' Redwood

CTD-2.2.18-RW

$54.69

100000002000
Sale

2" X 2" X 20' Redwood

CTD-2.2.20-RW

$60.76

100000002001
Sale

1-1/8"x4'x8' Plywood Panel

CTD-1-1/8-PLY

$244.63

100000002089
Sale

2" X 4" 20’ Douglas Fir

CTD-2.4.20-DF

$49.59

100000001947
Sale

2" X 4" 18’ Douglas Fir

CTD-2.4.18-DF

$44.63

100000001948
Sale

2" X 4" 16’ Douglas Fir

CTD-2.4.16-DF

$39.67

100000001949
Sale

2" X 4" 14’ Douglas Fir

CTD-2.4.14-DF

$34.72

100000001950
Sale

2" X 4" 12’ Douglas Fir

CTD-2.4.12-DF

$29.76

100000001951
Sale

2" X 4" 10’ Douglas Fir

CTD-2.4.10-DF

$24.80

100000001952
Sale

2" X 4" X 10' Redwood

CTD-2.4.10-RW

$48.91

100000002002
Sale

2" X 4" X 12' Redwood

CTD-2.4.12-RW

$58.69

100000002003
Sale

2" X 4" X 14' Redwood

CTD-2.4.14-RW

$68.47

100000002004
Sale

2" X 4" X 16' Redwood

CTD-2.4.16-RW

$78.25

100000002005
Sale

2" X 4" X 18' Redwood

CTD-2.4.18-RW

$88.03

100000002006

Filters

Category

Brand

Price Range

Condition

Availability

Compare parts

0 selected

Attribute
A worker in a hard hat and safety harness stands in the structural frame of a cooling tower.

Ready to upgrade to fiberglass?

Get in touch with a parts specialist today.

Frequently Asked Questions

Why choose an FRP cooling tower over a traditional wood cooling tower?

FRP (fiberglass-reinforced plastic) cooling towers offer significant advantages in durability, corrosion resistance, maintenance, and service life. Unlike wood, FRP does not rot, decay, or absorb water. It is also highly resistant to many chemicals and harsh industrial environments. For facilities looking for a long-term cooling solution with reduced maintenance requirements, FRP construction can provide a lower total cost of ownership over the life of the tower.

How long does an FRP cooling tower last?

A properly designed and maintained FRP cooling tower can provide 30–40 years or more of service life, depending on operating conditions, water chemistry, environmental exposure, and maintenance. Compared with traditional wood cooling towers, which typically have an expected service life of approximately 20–25 years, FRP can provide substantially greater longevity.

Does an FRP cooling tower require less maintenance?

Generally, yes. FRP eliminates many of the maintenance concerns associated with traditional wood construction. FRP structural components do not deteriorate through rot or decay. This can reduce ongoing maintenance requirements and help extend the useful life of the cooling tower. Routine inspections and preventive maintenance are still important for fans, gearboxes, fill, drift eliminators, nozzles, fasteners, and other mechanical components.

Is an FRP cooling tower stronger than a wood cooling tower?

Yes. FRP provides a high strength-to-weight ratio and can be engineered to meet the structural requirements of large industrial cooling towers. The structural design of an FRP tower is based on the specific project requirements, including wind loads, seismic conditions, equipment loads, operating environment, and tower design.

Can an existing wood cooling tower be replaced with an FRP tower?

Yes. Existing wood cooling towers can be completely replaced or upgraded with FRP construction. Depending on the existing tower configuration, the replacement can be engineered to utilize existing basins, piping, electrical systems, and other infrastructure where practical. Projects can also be phased to minimize downtime and maintain plant operation during construction.

Get in touch

Contact us for sales, service, parts, emergency services, etc.