New build – Oil & Gas LNG – Two (2) 16-Cell Plume-Abated

British Columbia, Canada

2022 – 102,720 GPM per tower, plume-abated CFF series, low-noise fans. Located in a remote and rugged area, the project presented significant logistical challenges. CTD coordinated the transportation of materials, equipment, and crews to the site while navigating harsh winter conditions, remote access, and complex scheduling requirements—all while maintaining the project’s demanding timeline during the COVID-19 outbreak.